CompTIA E2C Project Certification Exam

Question No: 61 – (Topic 1)

Which of the following techniques can a project manager use to assist with quality

planning? (Select Three).

  1. Peer review

  2. Critical Chain Method (CCM)

  3. Inspection

  4. Performance Evaluation and Review Technique (PERT)

  5. Work Breakdown Structure (WBS)

  6. Benchmarking

Answer: A,C,F

Question No: 62 – (Topic 1)

All of the following are part of the monitoring and controlling process group EXCEPT:

  1. updating the project charter.

  2. updating the project management plan.

  3. implementing change requests.

  4. updating the project scope.

Answer: A

Question No: 63 – (Topic 1)

After identifying the activities in a work package, which of the following is the NEXT step that a project manager should complete?

  1. Estimate costs

  2. Identify activities

  3. Build a project schedule

  4. Assign key stakeholders

Answer: A

Question No: 64 – (Topic 1)

In which of the following organization types would a project manager have the LEAST

amount of project authority?

  1. Functional

  2. Strong Matrix

  3. Balanced Matrix

  4. Weak Matrix

Answer: A

Question No: 65 – (Topic 1)

A project manager was asked to complete a project three weeks early and not crash the project. Which of the following should be done?

  1. Move some of the task to another release.

  2. Have the team work over time and give them time off later to save the budget.

  3. Continue to work and complete the project as soon as possible.

  4. Review the plan with the team and develop a way to reduce the time

Answer: D

Question No: 66 – (Topic 1)

The work breakdown structure (WBS) dictionary contains which of the following elements? (Select Three).

  1. Identification of stakeholders

  2. Description of work processes and procedures

  3. Quality control processes

  4. Estimated calendar time of activities

  5. Required resources

  6. Risk response strategies

Answer: B,D,E

Question No: 67 – (Topic 1)

One of the team members assigned to a project is not performing well. The team member is new and is not experienced in the type of work involved with this project. Which of the following is the BEST response to this situation?

  1. Ask other team members to help.

  2. Assign the team member to another project.

  3. Talk to the team member to encourage better performance.

  4. Arrange for training for the team member.

Answer: D

Question No: 68 – (Topic 1)

A stakeholder has determined the need to update their payroll method with a new system. Which of the following is the FIRST activity the corporation should perform?

  1. Conduct a feasibility study.

  2. Determine the justification of the project.

  3. Obtain a preliminary review by the project selection committee.

  4. Determine if the project is in alignment with the companys strategic plan.

Answer: D

Question No: 69 – (Topic 1)

A project manager is performing activity duration estimation. This project will have conditional decisions. Which of the following tools would be the BEST to use?

  1. GERT

  2. Gantt chart

  3. PERT

  4. EVM

Answer: A

Question No: 70 – (Topic 1)

A project manager is reviewing the ownership, date, and the necessary training for a deliverable. Which of the following documents would include this information?

  1. Transition plan

  2. Quality plan

  3. Change Control plan

  4. Procurement plan

Answer: A

100% Free Download!
Download Free Demo:JK0-017 Demo PDF
100% Pass Guaranteed!
Download 2017 Dumps4cert JK0-017 Full Exam PDF and VCE

Dumps4cert ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 Dumps4cert IT Certification PDF and VCE

Leave a Reply